Review overall costs, add freight, duty and miscellaneous costs, add production notes, and change manufacturer. The details set here will be applicable to all colourways.
1. Select Manufacturing Type
The Project will be created using your default manufacturing type from the settings - you can change for this project using the drop down.
There are 4 options to choose from:
- CMT DOMESTIC (CUT-MAKE-TRIM DOMESTIC)
- CMT IMPORTED (CUT-MAKE-TRIM IMPORTED)
- FG DOMESTIC (FACTORED GOOD DOMESTIC)
- FG IMPORTED (FACTORED GOOD IMPORTED)
2. Select Manufacturer
You can change the manufacturer from the drop down of all Manufacturers entered in your system. For more information on adding a manufacturer.
3. Enter any Production Notes
These will carry over to Z.Hub once published, these notes in Z.Hub would pull through to the Production Orders/ Dockets for the Manufacturer/Factory.
4. Add Label information
Add specific labelling information for the Manufacturer/Factory.
5. Add Freight Cost
Chose method from drop down and enter value
6. Import Duty
Add import duty %
7. Add miscellaneous costs
Chose method from drop down and enter value
8. View the difference in costs between colourways and stages
Choose from any of your colourways to see the cost differences (due to different raw materials between colours), and pick different stages if you would like to review the impact of any changes made from other stages. (as your raw materials can vary across stages)
The stage selected by default will always be the stage currently assigned to the Project. (as this would be the stage published into Z.Hub)
9. Review total costs
View overall cost summary - this will be displayed as per the colourway and stage dropdown.