The Costs tab shows the full cost of each Raw Material variant: the Production Cost plus any freight, import duty and miscellaneous costs. Together these make the Total Unit Cost, which Zedonk uses to cost your Projects.
The Costs tab appears on every Raw Material. If you leave it blank, nothing changes. Costs are entered per variant and per Season, and previous Seasons keep their own pricing.
Once a Raw Material is published to Z.Hub, the Costs tab is locked. To change freight, import duty or miscellaneous costs after publishing, update them in Z.Hub, see Raw Materials-Tab-Costs.
The Sampling Cost is not part of the Total Unit Cost.
Overview
- Include Invisible / Include Inactive - Select the relevant checkboxes to include invisible or inactive records.
- Variant/Colour List - View the list of variants (colours) within your raw materials.
- Supplier - View the raw material supplier.
- Production Cost - View the raw material unit cost entered in the Variant tab.
- Freight Method - Choose between a percentage (%) or value.
- Freight Currency - Select your freight currency from the dropdown.
- Rate - Enter the exchange rate or click Get Rate to pull through the exchange rate from your System Settings. See: General Settings - Seasons & Exchange Rates.
- Freight Cost - Enter the freight cost.
- Import Duty - Enter the import duty as a percentage (%).
- Miscellaneous Method - Choose between a percentage (%) or value.
- Miscellaneous Cost - Enter any miscellaneous costs. If you choose Value, this will be in your system's base currency.
- Total Unit Cost - Overall cost summary.
How to enter Costs to your Raw Materials
Step 1: Click the [Costs] tab
Open a Raw Material and click the [Costs] tab.
Then select the variant you wish to update.
Step 2: Check the Supplier and Production Cost
Supplier and Production Cost are shown for reference. This is the Production Cost, which you change on the Variants tab. See: Raw Materials - Add Variant/Colour.
Step 3: Add the Freight cost
Select a Freight Method: % or Value.
Freight as a percentage
Enter the Freight Percentage. This is a percentage of the Production Cost.
Freight as a set amount
- Select the Freight Currency. This can be any currency in your system and does not have to match the supplier's currency.
- Enter the Rate, or click [Get Rate] to fill it with the Exchange Rate from System Settings.
- Enter the Freight Cost in the freight currency.
For more information on rates, see Exchange Rate Overview and Raw Materials - Update Exchange Rate.
Step 4: Enter the Import Duty
Enter the Import Duty as a percentage. Zedonk applies it to the Production Cost plus freight.
Step 5: Add Miscellaneous costs
Select a Miscellaneous Method: % (Miscellaneous Percentage) or Value (Miscellaneous Cost).
Then enter the amount or percentage.
Use this for anything else you pay to land the material, such as testing or handling. Fixed amounts are in your base currency.
Miscellaneous Method: %
Miscellaneous Method: Value
Step 6: Review the cost breakdown
The panel on the right shows:
- Production Cost
- Freight Cost
- Import Duty Cost
- Miscellaneous Cost
- Total Unit Cost - the four costs above added together
Step 7: Click [Save] to confirm.
Step 8: To send the costs to Z.Hub
To send the costs to Z.Hub, you will need to publish the Raw Material.
Where the Total Unit Cost is used
The Total Unit Cost is used in Project BOMs and Project Costs. See:
To update several Raw Materials at once, you can use Raw Materials - Bulk Action.













